After nearly three days off site, it was good to finally get back to Binchester. It is amazing how much has changed in such a short period of time.
In Trench 1, we've now lost lots of the spine wall -perhaps inevitably, things are still just as complicated; the relationship between the features either side are not much clearer. However, it is noticeable how big some of the drain slots we thought were for horse pee have become. At least one looks almost like a pit rather than the narrow gully one might anticipate. In the northern compartment, we are now removing all the final remains of the late surfaces- the final elements of the stable floor area is coming off as are the flagstone floors. We're getting ready to go deeper... In the Tower, we've removed a big wodge (technical term) of material - it was photographed today, and we are now back to shifting dirt. Progress in the latrine area is great as reported yesterday; we've got evidence for what looks like some kind of cement or mortar within the conduit arch and associated gully. Chris Witmore from Texas Tech has also, I think correctly, interpreted two odd stones we had from within the latrine trench as part of the stone toilet seat installation!
In Trench 2, the bath-house baulk is nearly all gone and the room should be completely cleared by the end of the week. We are taking lots of environmental samples. IN the newly extended areas, the walls are coming up nicely. Excitingly on the northern edge of the trench we have what looks like it may be the base of another arch or even a barrel vault! The lintel and/or window is also cleaning up nicely. Again, complication strikes, as we've been comparing wall widths around the building- what we previously assumed was a simple extension of the front wall of the main bath building and had simply been knocked through to add the two alcoves turns out to be very different widths either side of the entrance!
Outside the bath-house, the final wall stones from the street front buildings have been removed and the floor levels are being thoroughly explored. Elsewhere where Morris has been digging what started off as an amorphous pit up against the boundary wall is turning into something more substantial!!
Thursday, 10 July 2014
Binchester 2014: Day Twenty-three

Sorry- I was away again today....
However, once again we have contributions from the dig team
From Trench 1 Laura Rich reports
Today was a continuation of exploration across the trench. The team continues to chase a large area of soot right outside the wall of the barrack and found a nicely intact skull that appears to be from a dog.
The most interesting development was a layer of concrete found within the latrine. It looks like the latrine was lined to facilitate waste removal and was relined at a later point. We have found concrete on both sides of the latrine, so we believe it connects.
Other finds in Trench 1 include a spearhead found by one of our local volunteers, Johnathan: As well as the remnants of a hobnail boot, found by Kimberly, one of the American students.
From Trench 2 Whitney Davies writes
Today in Trench 2, there was a lot of recording going on. We are recording different areas in preperations of removing them. We are also still working on the removal of the baulk in the bottom of the bath-house. On the east side extension of the trench, a window is emerging in one of the walls and on the northern side, the wall is extending farther back than originally thought. To the west of the bath-house, we are troweling down and discovered three great finds! We found a FULL bronze bangel, a FULL bronze broach that still has the pin intact, and a beautiful jet bead as well. Overall, we are making great progess!
Wednesday, 9 July 2014
Binchester 2014: Day Twenty-Two
I wasn't on site today so some members of the dig crew have written today's entry.
Laura Rich reports from Trench 1
Monday and Tuesday saw work progress over a broad section of Trench 1. The primary effort is still trying to figure out the phasing of the walls within the barracks. More of the barracks floor was cleared and areas of a stone surface were found, but it is not consistent with other areas. We are still trying to find a consistent surface for the floor of the barrack.
Today students unearthed two post pads. They are flat stones that dive into themselves, which seems to have happened after having a large weight placed upon it, such as a post. We would like to have more found before a clear interpretation can be made. New paving was cleared within the barracks, which lines up with some paving on the other side of the central wall.
In an area which to this point has been assumed to be one of the earlier sections of the barracks, a section of the wall was cleared to find large cobbles set into heavy grade clay. The building technique is similar to that used in other parts of the barracks which were believed to be a later addition. This opens the possibility that the walls could be contemporary to each other or it could just be a long-standing construction technique.
Monday and Tuesday saw work progress over a broad section of Trench 1. The primary effort is still trying to figure out the phasing of the walls within the barracks. More of the barracks floor was cleared and areas of a stone surface were found, but it is not consistent with other areas. We are still trying to find a consistent surface for the floor of the barrack.
Today students unearthed two post pads. They are flat stones that dive into themselves, which seems to have happened after having a large weight placed upon it, such as a post. We would like to have more found before a clear interpretation can be made. New paving was cleared within the barracks, which lines up with some paving on the other side of the central wall.
In an area which to this point has been assumed to be one of the earlier sections of the barracks, a section of the wall was cleared to find large cobbles set into heavy grade clay. The building technique is similar to that used in other parts of the barracks which were believed to be a later addition. This opens the possibility that the walls could be contemporary to each other or it could just be a long-standing construction technique.
whilst from Trench 2 Whitney Davies has written

In Trench 2, the main focus going on is the removal of the bulk that is still remaining on the bath-house floor. This is important because the bulk has been drawn stratigraphically and is being removed one stratigraphy at a time to show what the bath-house was possibly used for after it was a bath-house. There has been a large amount of cattle bones found in the different stratigraphies. We are also working on the extension by removing different layers of rock to see what lies underneath. In this process, we have some of the guys removing dirt from a small alcove located by the extension, which is revealing a filled in window. We are now removing the floor surfaces related to the buildings in front of the bath-house. To the west of the bath-house, there is also floor removal being done which is showing a large portion of black dirt underneath the rock flooring and a layer of clay. There was a cool piece of pottery found today that shows the markers mark on the bottom of the pot.
x
Monday, 7 July 2014
Binchester 2014: Day Twenty/Twenty One
Apologies once again for missing
another day. I'm currently burning the candle at both ends a little,
so battling to keep up with the blog. On Friday I was helping our
latest crop of BA Archaeology students graduate from Durham
University and today I took some of our US guests up to the North
Pennines to try and think about how the Romans might have engaged
with and explored the upland areas further up the river Wear.
So, what has changed on site in the
last couple of days? Not a huge amount primarily because across the
site we have been focussing on planning and recording. That is not to
say there has been no movement at all. In Trench 1 we are persevering
with clearing the turret, and there is lots of work clearing the
barrack floor. In the course of this one of our US crew revealed a
rather nice length of worked stone drain. It is sitting in the middle
of the floor of the northern compartment of the barrack block, but
it is not clear if it in situ.
In Trench 2, the central strip building
has had a lot of work on the floor revealing a large burnt spread.
Nearby, some large scoops or shallow pits are being explored around
the stone mortar wall that seems to mark the bath precinct boundary.
We are also still chipping away at the floor surfaces related to the
buildings in front of the bath-house Finally, there has been
continued earth moving on the areas where we have expanded the trench
to the north and east of the bath-house. In the course of this, one
of my favourite finds of the season was uncovered- a beautiful
miniature ceramic face, probably from a Crambeck parchment ware
vessel (later 4th century AD).
Thursday, 3 July 2014
Binchester 2014: Day Nineteen
Today in Trench 1 we were again focussing very much on
planning and exploring the barrack interior. In the south of the barrack the
team are taking off a clay layer and exposing an increasingly wide-spread
charcoally spread which seems to cover much of the barrack interior. Elsewhere
in the building, we continue to find spreads of metalled surface. Lots of work
on deconstructing the central wall of the barrack- the cobbled layer has come
off and we are down to a very crudely composed ‘foundation’ layer which seems
to be comprised of rubble roughly dumped in a trench – little order and lots of
voids. On the eastern rampart, the slot has been beautifully cleaned and now
photographed. In the corner the turret interior continues to be exposed.
In Trench 2, the trench extension is looking good-
mattocking is over and we are down to trowels. We can certainly see the top of
the east wall of the corridor coming through into the new area. In the southern
building, the central area of the ‘park rails’ building contains a large area
of burnt clay (probably a hearth) that is being slowly dismantled. To the west
of our new flagstoned area, Sue and Bethany are exploring a possible pit like
feature. New pits have also been found up against the eastern face of the new
mortared wall between the bath-house and the strip buildings. In the rectangular
structure that overlays this we are also
finding new surfaces and spreads, inevitably, of clay.
Wednesday, 2 July 2014
Binchester 2014: Day Seventeen-Eighteen
Apologies for the absence of yesterday’s blog entry- life
just got too busy! Still, lots to report today. In Trench 1, we’ve been trying
to get to grips with the complex sequence in the barrack blocks, particularly
the relationship between the layers in the later structure and those in the
earlier area. We have dismantled some of the spine wall to reveal some nice
underlying cobbles- but are these a cobble foundation or traces of a larger
cobble surface that have been ‘trapped’ beneath the wall. In the northern
section of the building and the area to the immediate south, we’ve been
tracking the nice metaled surface which seems to run beneath both and also to
the west of the main west wall of the barrack. Whilst exploring this we've
found yet more possible baby bones. In dismantling part of the western wall we’ve
also found at least one post hole underlying the wall line. In the area to the
east of the later structure, but within the earlier barrack we are starting to
pick up a number of what might be further drainage slots for horse stabling
areas, although this is not yet certain. We also have traces of another
possible early cross wall.
In the corner tower, we seem to have removed most of the
tumbled masonry and are working through a more consistent fill deposit. Just to
the south, our large slot through the rampart has hit the foundation slabs of
the inner face of the curtain wall- we've also got nice traces of a probable
turf rampart appearing in section, as well more hints of interior slots or
ditches which need clarification. Apart
from all this digging, Trench 1 is seeing lots of planning so we can start
taking apart other key surfaces.
In Trench 2, we are still leaving the bath-house main rooms
free, although some of the big guys in the new team have shifted some of the
larger lumps of rock that formed part of the crude pathway in the corridor
room. More importantly, they have also been cracking on with the removal of the
topsoil and turf over the new section we’ve opened up (just to square of the
trench and pick up any final hints of the plan). They have moved an impressive
amount of material in just three days! In the building to the south of the
bath-house, we’ve moved the final traces of the boulder walls of the later
building and have also started to shift the underlying smaller building. This
is helping show our nice clay interior, as well as pulling up yet more bone
(including an impressively intact cow skull). Margaret, working just to the east of the gable
end, found a rather nice heavy arrow head or ballista bolt yesterday. To the west of the building the team are also picking up a rather nice flagstone floor that seems to run between the bath-house and the street front.
In the
area to the west of the bath-house, it is now clear we’ve got late rectangular structure. This clearly
overlies the mortared north-south wall and has large boulder like footings very
similar to the later building to the south of the bath-house.
Also lots of nice finds- brooch fragment, "mounts", bone thingies and other goodies.
Monday, 30 June 2014
Binchester 2014: Day Sixteen
New week on site and we've been enjoyed by the US contingent- fresh from Texas and all points west (and north and quite possibly east as well). Great to see new keen faces and some familiar old ones. We've capitalised on this reservoir of enthusiasm by getting cracking with some important new tasks.
In Trench 1 we've started removing some of the central spine wall of the barrack- this will help us to start to get to grips with the surfaces that we can see either side of it, and which quite possibly run underneath it. We've also continued to work on the surfaces under the cobbled stable surface. The nicest find from within the barrack block came from the south end, where Bev found yet another small carnelian intaglio- this brings to three the number we've had from this area. Is this some kind of small scattered hoard of these objects?
In the north-east corner, a new crew started on the corner tower. They made great inroads moving the massive block of tumble that infills much of the interior - this will allow us to work down and clear down to the floor level which we've already exposed in other areas. Finally, in our rampart slot we've started going down revealing more courses of internal wall facing stones, we've also got traces of a possible palisade slot which is exciting.
In Trench 2, there was no work in the main room and corridor. Instead, we got cracking with a major new plan, which is to expand the trench a little more to reveal just a smidgen more about the bath plan. In the building in front of the glass, we've started the process of dismantling the second, earlier phase and are able to get down into the surfaces that underlie it. At the west end we're continuing to follow along the new flagstone surface that appears to form a pavement in front of the bath-house.
Nice finds today include a worked bone mount and a cracking jet bead.
In Trench 1 we've started removing some of the central spine wall of the barrack- this will help us to start to get to grips with the surfaces that we can see either side of it, and which quite possibly run underneath it. We've also continued to work on the surfaces under the cobbled stable surface. The nicest find from within the barrack block came from the south end, where Bev found yet another small carnelian intaglio- this brings to three the number we've had from this area. Is this some kind of small scattered hoard of these objects?
In the north-east corner, a new crew started on the corner tower. They made great inroads moving the massive block of tumble that infills much of the interior - this will allow us to work down and clear down to the floor level which we've already exposed in other areas. Finally, in our rampart slot we've started going down revealing more courses of internal wall facing stones, we've also got traces of a possible palisade slot which is exciting.
In Trench 2, there was no work in the main room and corridor. Instead, we got cracking with a major new plan, which is to expand the trench a little more to reveal just a smidgen more about the bath plan. In the building in front of the glass, we've started the process of dismantling the second, earlier phase and are able to get down into the surfaces that underlie it. At the west end we're continuing to follow along the new flagstone surface that appears to form a pavement in front of the bath-house.
Nice finds today include a worked bone mount and a cracking jet bead.
Subscribe to:
Posts (Atom)







