BIN11: Day Thirty-Nine

A quiet day with lots of rain, nonetheless work kept on going for much of the day. More work on the ovens- Suresh has made a lovely job on the small oven near the medieval building which has a nice floor constructed from stone slabs. The larger oven has now been fully opened up and the quest is now on to bottom it, with a layer of cobbles appearing through the clay. Nearby, we've started giving the corner tower a bit of a tidy up as part of the process of getting to better understand the rampart and related features. There has also been great progress in getting to grips with the gully/cobbles close to the big pit. Work inside the main building is going well- the large stone trough/item has been more fully excavated. It has a gap at one end with some stones arranged leading to it; it has all the appearances of a stone drain or soakaway, presumably the trough has been re-used from another context. Finally, on the western side of the main building, guess what? Looks like we've got another stone-lined pit!

No comments:

Post a Comment